Client outcomes
Case study
Before-and-after stories from venues we have treated water for—feed challenges, installed systems, and measured results.
Specialty Roastery, Riyadh
Challenge
Municipal water testing at 580 mg/L TDS. Espresso extraction was inconsistent shift to shift despite no changes to grind or dose.
Solution
Remineralising RO sized to a 3-group bar. TDS calibrated to 143 mg/L matching SCA brewing targets.
Result
Extraction variance resolved within two weeks of install. Zero boiler callouts in the 14 months since.
Hotel F&B Operation, Riyadh
Challenge
Scale buildup on combi ovens and steam lines triggering quarterly service calls and kitchen downtime.
Solution
Zoned softening across kitchen and laundry lines. Gold maintenance plan with quarterly visits.
Result
Service call frequency down 60%. Head chef reported measurable improvement in combi oven steam performance.
Commercial Kitchen Group, Gulf
Challenge
Ice machines across three locations producing cloudy, off-taste ice affecting bar presentation.
Solution
RO with UV polish stage on all ice lines. Sized per location by draw rate.
Result
Crystal-clear ice from day one across all sites. Systems have run 18 months without intervention.
Full case studies with client photography and performance data are in preparation. Ask our team for reference projects matched to your concept and load profile.